Modification to details and design by Harry Jackson | 5/29/2008 1:03 PM |
Response:
1. Yes, provided the intent of the design is not compromised.
2. The project must be bid as shown on the drawings, however the Owner will entertain any Contractor proposed cost cutting modifications following contract award. Such modifications must satisfy the original intent of the design and are subject to the approval of the Engineer.
|
| |
Krupp Drawings by John Christensen | 5/13/2008 10:54 AM |
Response:
We are having them rescanned at higher resolution and will repost them. The first four are posted in the Supplementary Information section below. The remainder should be done by 05/14.
|
| |
Project Cost Estimate by John Christensen | 5/9/2008 12:36 PM |
Response: This question was asked at the pre-bid conference. YCWA does not have a cost estimate available. YCWA has budgeted $1,000,000 for this work.
|
| |
Height of Spillway Gates by John Christensen | 5/9/2008 12:30 PM |
Response: As shown on drawing ZCC-15-211 the bottom of the gate is at Elevation 1901.35 and the Top is at Elevation 1957 feet which makes the vertical height of the gate 55.65 feet.
|
| |
Pre Bid Meeting and Job Walk  by Harry Jackson | 5/8/2008 3:59 PM |
Response:
|
| |